Mid Victorian Times of Great Change
The actual build is nearing completion,but it must be inspected before the water effect can be added.
Just red tape of some Government Department. After all a river directing a wetness where no wetness has ever been before must be inspected by highly skilled idiots that`s for sure.
The Tow Path
The Water Reservoir stands ready for the first pour.
So it has been slow in coming but it`s inspection day today for this part of the canal and Official looking
Men in black with matching tall hats to boot,must scale the stonework,
because silly me there are no steps.
The narrow boat going to HOBBS END,is well placed so Mr Mod ,and Mr Podge,will take a look and make a few mental notes. This is the beginning of their day, and after this they must investigate strange going`s on at Hobbs End,where the new underground railway is being built. Strange ghost-like demons and hopping imps have been seen by the work crew who are digging up London clay by the ton.
( The Bargeman is being converted and will be my first in seven months.)
"It seems all in order Mr Podge."
"It surely does Mr Mod. and that boat will move a lot faster with some water underneath it"
So with this quick eye ball of an inspection over,off they go over the wall to slid down the overgrown embankment. Perhaps steps will be added to another section.
Test samples of canal water effects are being carried out. Thanks for looking. BB